Kinshasa

Progress

Step 1 of 4 · Feasibility study

The project

One site to sort, recycle and generate electricity.

The recovery plant is the heart of the VIPRO programme. Waste collected in the districts arrives here, is sorted and weighed, then each material goes to its own channel.

What cannot be recycled is dried into a solid fuel for a power plant. The residues from that step go to Operation O2, which turns them into paving stones, bricks and street furniture.

  • SortEach material is weighed, then goes to its own channel.
  • RecyclePlastic, metal and glass are sold to recyclers.
  • Generate electricityThe plant runs on fuel made from waste.

Progress

Where the project stands.

The project's steps, in order. This page changes each time a step is completed.

  1. In progress

    Feasibility study

    The site, volumes and technology are under study. Figures will be published once the study is validated.

  2. Next

    Financing

    Bring the project's funders together, based on the validated study.

  3. Next

    Construction

    Build the sorting centre and the power plant.

  4. Next

    Commissioning

    Sort, recycle and generate electricity for Kinshasa.

Our projects

Other projects

  • Green Attitude

    The campaign that turns sorting into a habit, district by district, with the city's schools, markets and artists.

    See the project
  • Local pre-collection

    Drop-off points in each neighbourhood and collectors paid by the kilo, on tricycles and motorbikes.

    See the project
  • Opération O2

    A second life for materials: paving stones, bricks, street furniture, and commissions for Kinshasa makers.

    See the project

Companies, institutions, funders.

On-site collection, buying recycled materials, funding, research. Tell us what you are looking for.

Become a partner